Degassing

Find your optimal degassing solution

Know-how transfer day @Maillefer / On-site auditing
Technical manual / Software
3 days
MV, HV and EHV cable
Degassing

Interested in outstanding cable quality, less scrap and time and space savings?

We provide consultation for degassing facility design, enabling our customers to optimize their degassing process and time.
Description
The participants will find the optimal degassing solution and understand the degassing process better. The module also provides degassing time calculation extension to the NCC during calculation and simulation program, when applicable.


Deliverables

One know-how transfer day at Maillefer and two on-site consultation days.

Module know-how transfer documentation package in English for a maximum of four persons. Package includes:

  • Degassing technology
  • Degassing calculation parameters
  • Degassing times
  • Degassing standards.


Options

Optional topics:

  • NCC program with degassing time calculation.

Latest from Maillefer Blog

Powered by the Fire Tiger - Forty Years in China
Blog - Maillefer

It was 1986 when the last Fire Tiger appeared on the Chinese calendar. That was also the year when a delegation of former Finnish colleagues joined Chinese leaders to establish local offices in Beijing and Shanghai. The foundation for expanding modern wire & cable production within China was set. Today we celebrate 40 years since the launch while recognizing the powerful symbol of the tiger – much bravery, energy, passion, and charisma.

SimFactory
Factory Optimization Through Simulation Modeling
Blog - Maillefer

Managing bottlenecks is vital for efficient production. New simulation tools cut through the uncertainty. With SimFactory, you balance production towards peak efficiency.

State-of-the-Art Cable Strander
Blog - Maillefer

Assemble and pay-off quality core assemblies ready for jacketing of fiber premise cables with the new KN450 planetary strander. Its modular design lets you multiply the cable-making possibilities.